ANDREW@GROUNDNEUTRAL.COM
07710 792038
Whatever youR PROJECT, we're here to help you take the first stepS with confidence.
-
We're a small team of thinkers and doers, dedicated finding solutions to get the job done. Collaboration and high standards drive everything we do.
-
We believe in keeping things simple, smart, and human. Every project starts with listening and ends with something we're proud to share.
-
From small back garden projects to managing full builds, we partner with people who care about doing things right—and doing them well.
Our
Services
-

DEMOLITION
Hand and machine demolition, site clearance, and preparation. All inert materials are sent for repurposing or recycling where possible.
-

GROUNDWORKS
We offer a complete range of groundworks solutions, including site preparation, foundations, percolation tests, drainage installation, concrete works, and external infrastructure
-

STRIP OUT
Making safe, striping out including kitchens, bathrooms, to load bearing walls, and finishing with site preparation for the next phase of works
-

PROJECT MANAGEMENT
Multi layered project planning and coordination of trade partners from inception to completion and handover, including certification.
Newhaven, edinburgh
GROUNDWORKS / concrete slab
We were appointed to construct a new concrete foundation slab for a large summer house, providing a strong, durable, and level base for the structure. The project involved full site preparation, excavation, and concrete works to ensure the foundation met the required specifications and would provide long-term performance.
The works commenced with the excavation and preparation of the area, followed by the installation of a 150mm compacted Type 1 sub-base to create a stable foundation. We then supplied and poured a 4.5m x 15m C35 concrete slab, finished with a professional float finish to achieve a smooth and level surface ready for the installation of the summer house.
Works Completed:
Site excavation and ground preparation
Installation of 150mm compacted Type 1 sub-base
Construction of a 4.5m x 15m concrete foundation slab
Supply and placement of C35 concrete
Float finish to provide a smooth and level surface
Site clean-up and completion works
The project was completed safely, efficiently, and to a high standard, delivering a robust foundation capable of supporting the large summer house for many years to come.
SLATEFORD RD - EDINBURGH
FULL BUILD Demolition / groundworks / PROJECT MANAGEMENT
We came into contact with Ground Neutral during our search for a contractor for our new build development - a 2 storey detached building in Edinburgh. The scope of the initial works was the groundswork, which included uplifting and demolition of a retaining wall backing up to a piece of sloping ground. This portended a real risk in that, the whole garden grounds could come cascading down upon removal of the retaining wall, and a few contractors we spoke to decline to take on the project, or were ready to charge a hefty contingency for this. However, after interviewing various contractors and reviewing several quotes we engaged Ground Neutral. Whilst the risk to the retaining wall remained, we were given assurances that the demolition would be done brick by brick to minimise any landslide.
We were impressed with the works which was completed to good quality. We engaged in conversations about taking on the entire development and agreed a larger scope of work that was originally planned. The development was challenging, given the location, site conditions, and the different parties involved from both public and private sectors. The company however took on each challenge, providing guidance and suggestions along the way, as well as leveraging their contacts from other projects and relationships, to support the work.
The new build was completed early 2026 and the finished product was to a high standard and quality finish. The company has also being responsive in sorting out snagging issues, post completion. We could not have been able to deliver the project without the company's flexibility, ingenuity and 'can-do' attitude. Andrew, who led the delivery, brought a great deal of professionalism, and personality into the work, and was willing to work through very challenging aspects, both on the job and human side.
Niyi
Shepha Properties
HOW WE MANAGE WASTE
We are committed to responsible and sustainable waste management practices on every project. All materials are carefully segregated, and wherever possible, materials are reused in their original form for future projects or initiatives that deliver positive social and environmental benefits. Inert materials are crushed and recycled into MOT Type 1 aggregate for reuse where applicable, helping to minimise waste sent to landfill and reduce environmental impact.
Contact Us: 07710 792038
CRAIGMOUNT, EDINBURGH
DEMOLITION / GROUNDWORKS
We were appointed to carry out the soft strip-out of the living room, kitchen, and hallway in preparation for the demolition of two load-bearing walls. Due to the structural nature of the works, the walls were carefully supported throughout the process to ensure the safety and integrity of the existing property while facilitating the construction of a new extension.
Following the demolition phase, we delivered a comprehensive groundworks package to prepare the site for the next stage of development.
Works Completed:
Soft strip-out of the living room, kitchen, and hallway
Structural support of two load-bearing walls
Drainage installation package
Underpinning of existing foundations
Excavation and pouring of new foundations
Construction of blockwork up to solum level
Installation of concrete floor slab
What Our Clients Say
-
Remove & replace crumbling wall
Job well done. All we asked for. Very efficient and polite. Site left clean and tidy full stop. Would recommend and certainly use again - Bob (Broxburn)
-
Prepare & Install concrete pad for garden room
Job required preparing ground and foundation for 15 metre x 5 metre garden room. Prompt, competitive quote, excellent communication, job carried out as per specification and on time. Advice and explanation given for all queries freely given. Would have no hesitation whatsoever in recommending ground neutral limited. Very appreciative to have a job successfully completed from start to finish - Alan (Edinburgh)
-
Garage Demolition
The team were professional and very helpful in deconstructing and removing a large slate roof garage, that was going to collapse. They took away all materials that could not be repurposed. Would highly recommend, and will be using them again myself - Lee (Jedburgh)
-
Garage Demolition & Removal
Outstanding service and support. Hardworking, safety conscious and competitively priced. Highly recommend - David (Gullane)
-
Porch demolition
Excellent service from Ground Neutral. Would highly recommend, was quick to respond, came to the house, gave me a quote and demolished our porch very easily. Took all the stuff away and tidied up. Would definitely use again - Anna (Edinburgh)
-
Roof removal & building works
We had a great experience working with Ground Neutral. The work was complicated including taking down a roof, cutting down steel beams, and reusing them as lintels, and also forming openings in 600mm stone walls in an old steading. Stone was salvaged and dressed for the ingoes, and increasing the height of a gable. The guys were enthusiastic and very capable as well as friendly and tidy. We would highly recommend them - Bob and Alison (Dunfermline)
Eldersley road, edinburgh
electrical ducting and reinstating
We were appointed to carry out excavation and reinstatement works to facilitate the installation of a new electrical supply. The project required careful handling of existing materials to minimise disruption and maintain the appearance of the surrounding area upon completion.
Our team carefully lifted and stored the existing flagstones before excavating a trench for the new electrical cable route. A compliant ducting system was then installed in accordance with current regulations and project specifications. Once the installation was complete, the excavation was backfilled and the original flagstones were reinstated to their previous condition.
Works Completed:
Careful lifting and storage of existing flagstones
Excavation of trench for new electrical cable installation
Installation of electrical ducting in accordance with regulations
Backfilling and compaction of excavated areas
Reinstatement of existing flagstones
Site clearance and completion works